Preparing the rails
The rails in which the wheels are going to run in is adjusted to fit the wheels as good as possible.
An aluminum U profile is used and then cut to the right depth with a saw.
The rails are then screwed in place at the lower beam of the NW moving wall.
The screw holes are slightly beveled to make the screws as smooth as possible for the wheels to run over.