October 2020
3rd
- NW moving wall is dimensioned
- Beamwork constructed
- Beamwork constructed
- Construction of stairs
- Construction of stairs
- Beamwork of SE moving wall
- Wind protection sheet put in place
10th & 11th
- Door handle montage
- Door handle montage
- Floor construction
- Floor construction
- Floor insulation
- Inner wall construction
17th
- Preparing the rails
- Mounting the wheels
- Mounting the wheels
- NW sliding wall in place
- NW sliding wall in place
- NW sliding wall in place
- Insulation of the walls
- Insulation of the walls
18th
- SE moving wall construction
- SE moving wall construction
- SE moving wall in place
- SE moving wall in place
- SE moving wall in place
- Wall binding beam
- Wall binding beam
- Observatory from the outside
24th
- Electricity addon
- Placing the power outlets
- Placing the power outlets
- Placing the power outlets
- Insulating around the outlets
- Moisture barrier is mounted
- Inside cover boards put in place
31st
- Ridge board and first truss
- Second truss
- Ridge board and truss
- The middle trusses
- Fixating the trusses