Preparing for the wall’s outer layer

After the wind protection foil has been applied it wont be possible to access the corners with the dubble beams anymore for insulation. Therefore this is prepared in advance.
Short horizontal beams are also attached between the vertical beams every 60 cm to hold the covering boards of the wall in a later step.

Leave a Reply

Your email address will not be published. Required fields are marked *