Ridge board and first truss
The ridge board of the moving roof is put up and held in place by a temporary vertical beam attached to the horizontal beam connecting the two moving walls.
Also the first truss board is attached with screws through the ridge board. The other side of the truss is cut in the right angle placed on the top cross-tie of the NW moving wall.