Bedrock attachment
Four holes are drilled into the bedrock and the rebars are then put in and fixed with a ceramic glue.
A sealing strip is also placed between the metal duct and the bedrock.
Four holes are drilled into the bedrock and the rebars are then put in and fixed with a ceramic glue.
A sealing strip is also placed between the metal duct and the bedrock.